Probably my longest hiatus from this oh so hot, melted even, thread.

Don't know if it made headlines over there, but at Fukushima Daiichi power went out to the cooling on multiple spent fuel rod pools (which have nothing to do directly with the reactors themselves, but are actually much more dangerous by most measures). Luckily, these pools take days (around 4 to be more exact) before lack of cooling becomes a problem, and it is already largely under control. Only had 20 hours of non-cooling this time.
_________________________
We are what we repeatedly do - Aristotle